|
Thermotech offers Maxit ABS commercial screeds.
ABS floor preparation provides a fast track solution to a high-performance, flat suface ready for direct application of vinyls and carpets, minimising down time and optimising the floor-to-ceiling height. They have been developed for optimum speed, allowing foot traffic within as little as just a few hours and can be ready to receive final floor covering in as little as 24 hours. There are products for use in insulated, acoustic or heated floors and a range of thicker floating and bonded screeds suitable for any floor levelling requirement.
Solve your commercial floor problems
Quite simply, no retailer can allow a problem floor to continue, even apart from the issues of Health and Safety, the cosmetic appearance of any area open to customers is of direct importance to business. If an existing floor begins dusting and breaking up then a new thin levelling layer should be applied to the substrate that would in itself provide a visually acceptable, smooth, flat, hard-wearing and non-dusting surface. maxit’s ABS 410 DuroTop® can be pumped to an average depth of only 7 mm, after an hour the floor is walkable and the following day the whole area cab be opened up to the finishing trades to re-install the racking and display gondolas.
|